3. Conservation Districts Role

3.1 District Structure

In 1945, the Pennsylvania General Assembly recognized the need to support grassroots conservation efforts. As a result, the Conservation District Law was passed (P.L.547, No 217), and districts were created. Today there is a district established in every Pennsylvania County except Philadelphia.

Conservation districts implement a variety of programs, and provide assistance for a range of issues unique to their county, such as: Dirt, Gravel, and Low Volume Roads Program; Abandoned Mines; Agricultural Land Preservation; Chesapeake Bay Program; Environmental Education; Erosion & Sedimentation Pollution Control; Floodplain Management; Forest Management; Nutrient Management Program; Storm Water Management; Waterway Protection; West Nile Virus Surveillance Program; Wildlife Management; and more.

Each district is led by a board of directors made up of local people from all walks of life. These volunteers study county natural resource issues and make decisions which enhance and protect the local community.

3.2 Overview

Section 9106 of the PA Vehicle Code created a dedicated, non-lapsing fund to provide money and training to local communities for local road maintenance. Annually, $28 million is distributed by the SCC to districts in Pennsylvania through a five-year agreement.

The districts are the entities that administer the Dirt, Gravel, and Low Volume Road Maintenance Program. Each county utilizes a Quality Assurance Board (QAB) that advises the district on local program policies and recommends projects for funding. The role of the QAB is detailed in Chapter 4 of this manual.

District staff play a very important role in the administration of the Program by performing a wide variety of tasks including education and outreach, project evaluation, technical assistance, project oversight, accounting, and auditing.

3.3 Receiving Funds from SCC

3.3.1 Five-year Agreement

Funding is apportioned by the SCC to districts through a five-year agreement that allows funding transfer without initiating annual contracts or contract amendments. Conservation districts receive an annual allocation of DGLVR funds each fiscal year (starts July 1) pending state budget approval. A minimum amount of the allocation must be spent on low volume roads (paved or sealed surface with 500 vehicles per day or less). The remainder of the allocation can be spent on dirt and gravel roads (DGR), which have unpaved or unbound surfaces, or low volume roads (LVR) at the district’s discretion.

The PA Treasury is requiring all vendors, including conservation districts, to receive funds via direct deposit. Districts may find it easier to keep “Dirt and Gravel” and “Low Volume Road” funds in separate accounts. However, it is not required to have a separate account for dirt, gravel, and low volume road funds, if they can provide for separate accounting of the funds.

3.3.2 Advance Working Capital

Districts may receive up to 50 percent of their annual allocation as advanced working capital. The SCC may withhold advance payments at their discretion. Advanced working capital is typically distributed to districts at the beginning of each fiscal year. No district action is required to receive advanced working capital other than to have an active five-year agreement with the SCC and to be in compliance with the SCC spending requirements outlined below.

When the working capital advance is disbursed to the district, it will be accompanied by a detailed statement approved and signed by the SCC showing the total amount advanced, the maximum amount that may be used for administration, the maximum amount that may be used for education, the minimum amount that must be used for projects, in addition to identifying the amount available for replenishment in that year’s allocation. This form must be retained in the district’s files for audit and QAQC purposes. The SCC may require periodic reporting of funds remaining in district accounts.

3.3.3 Replenishment of Working Capital

As districts spend advanced working capital on administration, education, and project work, they are eligible to receive a replenishment of funds from the remaining 50 percent of their allocation remaining in Harrisburg. Only funds that have been actually spent by the district or advanced to grant recipients, not simply committed to a contract, are claimed as replenishments. Replenishment of advanced working capital is done through the Program’s DGLVR Mapper during quarterly reports detailed in section 3.10. Actual expenditures are reported each quarter, and replenishments will be automatically generated. One DGLVR replenishment is generated each quarter until the district’s funds remaining in Harrisburg have all been disbursed.

3.3.4 Spending Requirements

Districts are required to spend their entire allocation within two years of state budget approval in order to be eligible for future allocations. If a district does not spend sufficient funding, the funds will revert to the control of the SCC. The SCC may also determine that the district is ineligible for future allocations or reduced future allocations. When that occurs, that district’s future allocation(s) may be distributed to other districts using existing allocation formulas. Districts that miss one or more year’s allocation will be eligible for future allocations once again after the two-year spending requirement is met. The SCC may, at its discretion, extend the two-year spending requirement if circumstances warrant.

Dirt and Gravel Road allocation spending must be tracked separately from Low Volume Road allocation spending. Ineligibility for Dirt and Gravel Road allocations does not necessitate ineligibility for Low Volume Road allocation, or vice versa.

Administrative and education/training expenses must be utilized in the fiscal year they are allotted. DGLVR funds cannot be used for administrative or education/training expenses after the end of the allotted fiscal year without written permission from the State Conservation Commission. Districts must request approval to carry administrative and education/training funds into the following fiscal year using the DGLVR Geographical Information System (GIS) quarterly report system. At the end of the first fiscal year, all remaining DGR and LVR funds from the allocation must be spent on projects as outlined in Section 3.3.4.

Each conservation district’s spending requirements are tracked in the Program’s GIS (see sections 3.9 – 3.11). The funds available to be spent on administrative and education/training costs are tracked in the “Claimable Admin/Edu” tool within the quarterly report tool. There is also a “Budget Tool” in the quarterly report system and a “Spending Requirements Budget Tool” in the annual summary report that are available to assist districts with budgeting their DGLVR funds.

The 2-year spending requirement is tracked in the Annual Summary Report tool in the GIS. The total spent is calculated as the total of what has been spent on projects under contract, completed projects, administration, and education since the beginning of the Program. The spending requirement is the amount the conservation district must spend to receive the next year’s allocation. The spending requirement is equal to the total of all allocations the district has received except for the last 2 complete allocation cycles. The difference is calculated by subtracting the total spent from the spending requirement and must be zero or greater for the district to receive the next year’s allocation. To be eligible for an allocation, a conservation district can have no more than two years of allocation unspent.

3.3.5 Program Reduction or Termination

The Dirt, Gravel, and Low Volume Road Program is a voluntary program for districts. Districts may choose to receive a reduced allocation or temporarily suspend their entire allocation for various reasons. Districts may also choose to withdraw from the Program (either DGR, LVR, or both) and return funding to the SCC. Districts who elect one of these options may return to full Program participation in future years with SCC approval. To discuss any of the options mentioned above, contact the Program Director at the SCC.

Pursuant to the five-year agreement between the SCC and districts, when the SCC determines that the terms and conditions of the agreement are not materially being met, the SCC may suspend the agreement, require the return of funds, or reduce future allocations, and take other actions deemed appropriate.

3.4 Accounting of Funds at District

3.4.1 Separate Accounting

Districts must place all funds received from the SCC in an interest-bearing Federal Deposit Insurance Corporation or equivalent insured account. Districts must work with their banking institutions to assure that account balances more than $250,000 are also insured or otherwise collateralized.

While it is not required to have separate accounts for Program funds, separate accounting is required for DGLVR administrative expenses, DGLVR education expenses, DGR project work, LVR project work, and DGLVR interest.

The SCC may approve other lending, borrowing and savings institutions for districts to utilize for the Dirt, Gravel, and Low Volume Road Maintenance Program funds on a case-by-case basis. While it is not required to have separate accounts for Program funds, separate accounting is required for DGLVR administrative expenses, DGLVR education expenses, DGR project work, LVR project work, and DGLVR interest.

District records relating to the Dirt, Gravel, and Low Volume Road Maintenance Program projects must be kept for a minimum of seven years from the date of final payment on a project. Administrative and education expense records must be kept for a minimum of seven years from the end of the fiscal year in which the expenses were utilized. Records of interest earned must be kept for a minimum of seven years from the end of the fiscal year in which the interest was earned. The PA state fiscal year runs from July 1st through June 30th.

Dirt, Gravel, and Low Volume Road funds, which include funds for projects, education, and administration, are to be used solely for Dirt, Gravel, and Low Volume Road Program expenses.

3.4.2 Cost allocation Method for Shared Expenses

Some conservation district expenses, such as vehicles, rent, field or office equipment, and office expenses, are shared between the DGLVR Program and other programs or funding sources. A portion of shared expenses may be eligible DGLVR administrative and/or education expenses, as detailed below:
The percentage of shared expenses that are eligible DGLVR expenses are equal to the percentage of the expenses used for DGLVR activities. Districts must use a reasonable method to determine this percentage. Examples of eligible cost allocation methods are available in the Project Management/CD Financial Resources page. For assistance in developing a cost allocation method, contact the SCC.

  • Usage is often, but not always, estimated by staff time spent on various programs. This is not always the same as allocating based on the number of programs a district administers because the amount of staff time spent on/resources used for each program can vary significantly. Using this method, the percentage of shared expenses that are eligible DGLVR expenses are equal to the percentage of staff time spent on DGLVR activities. The percentage of staff time spent on DGLVR activities must be calculated compared to the total staff time spent on all programs/activities sharing the expense.
  • Salaries and associated benefits can only be paid for with DGLVR funds for time spent working directly on the DGLVR Program. Tracking can be done on an hourly basis, a percentage effort basis, or some other method that allocates salary in accordance with time spent on the DGLVR Program.
    • If a conservation district chooses to divide salaries on a percentage basis, then the percentage of a staff member’s salaries and benefits paid for with DGLVR funds must be proportionate to the amount of time that staff member spends on DGLVR activities out of the staff member’s total hours in a given time period.
    • The conservation district must keep and be able to provide documentation to the SCC of time spent on DGLVR activities as part of the administration and education funding record-keeping.

3.4.3 Administrative and Education Funds

As per program legislation, a district may use up to 10 percent of their total allocation for administering the Dirt, Gravel, and Low Volume Road Maintenance Program. A district may use up to another 10 percent of their total allocation for education expenses in the DGLVR Program. Administrative and education funds must be tracked separately from project funds. The primary purpose of administrative funds is to assure adequate funding for technical staff who work on the Program. The primary purpose of education funds is to allow the district to attend trainings and events for their own education, and to provide training and events for potential grant applicants. Districts should keep this in mind when choosing which expenses to pay with administration vs education funding. Additional guidance on eligible administrative and education expenses are described below.

Administrative and education funds must be spent on eligible expenses as they are incurred; funds cannot be transferred in advance to a separate account. Administrative and education expenses must be incurred within the allotted fiscal year. Administrative and Education funds cannot be carried over to subsequent years, unless otherwise approved by the SCC. Administrative and education expenses are outlined in the SCC Statement of Policy Section 11 (Appendix B). The district is responsible for keeping accurate and detailed records of what was paid for with administrative funds for a minimum of seven years from the end of the fiscal year in which the expenses were incurred. This documentation must be available to the SCC upon request. The district is responsible for properly reporting these expenditures in the GIS Program as described in sections 3.9 – 3.11. A district is not required to spend any or all their 10 percent allocation allowances on administration or education. Funds not spent on administration or education each fiscal year must be spent on projects.

Expenses Eligible to be paid with Administrative and/or Education funds

  • Salary
    • This includes technical staff, support staff, and management salaries related to administering the Program.
    • Benefits associated with those salaries are also an eligible expense.
    • Salaries can only be claimed for time spent working directly on the DGLVR Program. Tracking can be done on an hourly basis, a percentage effort basis, or some other method that allocates salary in accordance with time spent on the Program. Conservation districts must be able to document that staff time claimed as DGLVR time is spent on DGLVR activities. This could be a time sheet and/or report that includes details of the activity, including the date, activity description, staff member(s), amount of time, road name, road owner, and how the activity qualifies as a DGLVR activity, or some other method that documents that time is spent on DGLVR activities.
  • Travel
    • Includes all expenses directly related to Program administration and education, such as travel to field sites, meetings, trainings, vehicle costs, per-diems, parking, etc.
    • Note that the federal mileage rate is based on the average costs of operating a vehicle in the United States and is intended to cover expenses including, but not limited to, fuel, tires, maintenance, registration, and insurance. When mileage driven for the DGLVR Program is compensated using the mileage rate method, individual vehicle expenses are not eligible DGLVR expenses, and vice versa. If it is documented that mileage rate does not cover actual vehicle expenses, additional DGLVR admin and education funds may be used to cover these expenses with SCC approval.
  • Field equipment
    • The SCC recognizes the need for program staff to have the proper equipment necessary to implement the program. Funds can be used to purchase equipment for conservation district use such as levels, tapes, survey equipment, safety equipment, etc.
    • Funds can be used to purchase equipment for loan/rent to applicants such as traffic counters, grader blades, leaf blowers, etc.
    • The SCC expects that townships and other entities that have existing road maintenance crews should be equipped to do road maintenance. Funds can NOT be used to purchase tools or equipment for townships or other applicants, including cost-sharing on tools or equipment.
  • Demonstration projects: Refer to section 3.4.6 of this administrative manual for details.
  • Office expenses: Includes all expenses directly related to Program administration such as computers, printers, communication services, expendable office supplies, etc.
  • Overhead costs such as insurance, utilities, rent, etc.
  • Aggregate testing
    • Testing DSA, road fill, and key pieces for stream restoration are most common.
  • Consultant services – See section 3.7.4.7 for details on paying for consulting services on individual projects. Contact the SCC for consulting services needed outside of a standard contract.
  • Training costs
    • Costs for district staff to attend training are an eligible expense.
    • Direct costs of providing training or education could include facility rental, food, educational materials, providing transportation, etc.
  • Promotional materials
    • Promotional materials may include advertisements, reports, websites, project signage, and promotional items.
    • Promotional items are items given away to potential grant applicants for education and outreach, such as pens, hats, door prizes, etc. Spending on promotional items is limited to $3,000 of DGLVR funds annually unless otherwise approved by the SCC.
  • Participation incentives
    • Participation incentives could include paying travel expenses related to educational activities for potential applicants or QAB members.

3.4.4 Project Funds

A minimum of 80 percent of a district’s allocation must be dedicated for project work. Project funds must be tracked separately for Dirt and Gravel Road and Low Volume Road projects. Project funds must be spent within two years of State budget approval. The details of project funding, including eligible projects and expenses, are detailed in section 3.7.

3.4.5 Interest Funds

All interest accrued from Program funds (administrative, education, and projects) must be used only for DGLVR expenses. Interest income must be reported in the DGLVR Mapper during each quarterly report. Records of interest earned must be kept for a minimum of seven years from the end of the fiscal year in which the interest was earned and must be available to the SCC upon request.

3.4.6 Demonstration Projects

A “demonstration project” is a project that is funded by the district that does not follow the lifecycle of the “typical project” below. Demonstration projects can be implemented by the district to showcase a particular practice or project without the typical application submittal and ranking process.

Demonstration projects can be implemented by the district to showcase a particular practice or project without the typical application submittal and ranking process. Only administration and education funds can be used to fund Demonstration Projects.

Certain conditions must be met before a demonstration project can be funded without the typical application submittal and ranking process:

  • Only education or administrative funds can be used.
  • Must follow existing Program policies: be on an eligible public road; focus on environmental improvements; meet LVR traffic counts; etc.
  • Must have QAB and district board approval.
  • Must have a contract, MOU, or other agreement with the road-owning entity.

If the district enters into a contract with the road-owning entity to complete a demonstration project, standard Program contracts and procedures apply. The district must ensure that all permits are obtained prior to construction, and must comply with all federal, state, and local requirements including prevailing wage. A district may fund a demonstration project by paying for materials and subcontractors directly. A separate agreement must be made with the road-owning entity that identifies the following:

  • The size and scope of the project (including location map, a project sketch, and an itemized cost estimate).
  • The district’s responsibilities for the project.
  • The road-owning entity’s responsibilities for the project.
  • The road-owning entity is responsible for any future maintenance that may be required.

These additional requirements are needed since a standard Program contract between the district, and the applicant may not be used. A typical Program project is one that is submitted by an applicant, reviewed and ranked by a Quality Assurance Board (QAB), and approved for funding by the district board. Typical projects can be used for educational purposes. Education events on typical projects usually entail inviting other potential applicants out to the site for an educational session before, during, or after project implementation. They are especially effective to highlight practices that are new to a particular county or region. These “typical projects” are funded with project funds, while education/administrative funds can be used to cover the costs of the training or educational event.

Demonstration projects are not intended to be used to circumvent training requirements or typical project agreements with eligible applicants. If project funds are to be used, the project becomes a “typical project” and must go through the standard application submittal and ranking process. When a district funds a demonstration project, the district can either contract with the road-owning entity, or purchase material and contract directly with the contractors performing the work.

3.5 Dispersing Funds to Grant Recipients

It is acceptable to advance some funds at the beginning of the project, pay for portions of the project as work is completed after bills and receipts are submitted, or wait until the project is entirely completed to pay the entire amount at one time. Districts should develop their own individual policies regarding payment to project grantees (Statement of Policy section 14.c(1)). A written schedule of payments in conformance with local policies and the SCC Statement of Policy must be included in the contract.

3.5.1 Advancing Funds to Grant Recipients

Up to 50 percent of the contract amount may be advanced to grant recipients once a contract is signed. More restrictive policies can be set by the local QAB.

In addition to advancing up to 50 percent of funds in advance of project work, it is also acceptable to provide additional funding (up to 70 percent of the project funds) after the project is underway. Subsequent payments are only to be made on a cash expended basis.

3.5.2 Remainder of Funding to Grant Recipients

In accordance with the SCC Statement of Policy (section 14.c(3)), the district shall withhold payment of at least 30 percent of the approved project expenses (contract amount plus any amendments) until the satisfactory completion of the project. Final payment for the project expenses shall be made only after a final on-site inspection by the district determines that the work was performed consistently with the project application and the work plan, and any pertinent standards and specifications and to the satisfaction of the district. Funds can only be spent on actual eligible expenses, which may be less than the contracted maximum grant amount. For final payment to be made to a grant recipient, a project completion report and receipts/invoices for all grant expenses are required. Other documentation may also be required such as DSA certifications or off Right-of-Way (off-ROW) consent. An optional “File Checklist” that outlines documentation required and recommended to be kept in project files is available in the Project Management/CD Financial Resources page.

3.5.3 Contract Amendments

In some cases, the grant recipient may request additional time or funding above the contracted amount to complete a project. The approval of additional time or funding to a contract is at the discretion of the district board, based either on a case-by-case basis or by county policy. Districts may develop their own policies for handling cost overruns and time extensions, provided they are consistent with SCC policy. It is the discretion of the conservation district board how to handle amendments to existing contracts. Options include but are not limited to: requiring district board approval; requiring QAB and district board approval; empowering district staff to approve amendments, etc. There is no additional funding from the SCC to pay for cost overruns.

For cost overruns totaling 40 percent or less of the initial contract amount, the Contract Amendment must be completed and signed by both entities (available from the Center’s Required Project Blank Forms page). Multiple amendments may be granted, provided the total of all amendments is not more than 40 percent of the initial contract amount. For contract amendments of over 40 percent of the initial contract amount, written approval is required from the State Conservation SCC. For extensions of the completion date of the project, the same “Amendment form” described above can be used. Keep in mind that an amendment may increase the total value of the project so that prevailing wage will apply to contractor costs. More on prevailing wage in sections 3.7.4.4 and 3.7.4.5.

Districts may wish to amend a contract to change the scope of work. While use of the contract amendment form is not required for this, it is an acceptable use of the contract amendment. The schedule of payments can be updated using the GIS and schedule of payments form. The schedule of payments or scope of work can be updated at any time.

3.6 District Educational Opportunities

There are many opportunities for education and training for districts in various aspects of Program administration and project implementation outlined below. Also outlined below are ideas for districts to implement education and outreach efforts to municipalities and other entities within their county.

A Training Course Registration system is available on the Center for Dirt and Gravel Road Studies website to sign up for training opportunities and view completed certifications.

3.6.1 Education and Training FOR Districts

3.6.1.1 Environmentally Sensitive Maintenance (ESM) Training

The ESM training is a two-day course that covers the road maintenance practices employed by the Program. ESM training is made available to all district board members, QAB members, and district staff. It is highly recommended that all people representing the district who have a significant role in the Program attend an ESM training.

ESM training is mandatory for at least one district representative on the QAB, and for the district staff person(s) most involved with the Program. ESM training must be taken once every five years to maintain certification.

3.6.1.2 Stream Crossing Replacement Training

This multi-day training covers the details of completing a stream crossing replacement through the DGLVR Program. It includes both remote and in-person sessions, and includes topics ranging from conducting a longitudinal profile, reviewing project plans, construction oversight, and final inspection.

Effective July 1, 2023, at least one conservation district staff member must have completed the DGLVR Program’s “Stream Crossing Replacement Certification Training” and received a certificate of completion before the QAB can recommend or the conservation district can approve a contract for a project involving a stream crossing. A Stream Crossing Replacement Re-Certification Training must be taken once every three years to maintain staff certification. This training requirement does not apply to crossings that qualify for a Level 3 crossing replacement.

3.6.1.3 Annual Maintenance Workshop

ESM training provides training on the fundamentals of environmentally sensitive road maintenance. The annual workshops give the opportunity for more in-depth training on a wide variety of subjects such as diagnostics, stream crossings, low volume roads, and demonstration projects. The workshop is held at a different location in Pennsylvania each year. Many workshop sessions include bus trips to actual project locations. Individuals that have a current ESM training certification may attend an annual workshop once every five years in lieu of re-taking ESM training. Individuals whose five-year ESM certification has expired may not use the workshop as recertification but must re-attend an ESM training.

3.6.1.4 Administrative Training

Administrative training is available for district staff, QAB members, and others. This training will cover the administrative policies and guidance provided in this manual. Administrative training is required for staff person(s) most directly responsible for administering the Program. Identified district personnel responsible for administering the Program must be recertified at least once every five years. Additional Trainings are available, both in-person, remote, and recorded. Please see the Program Administration Training for details.

3.6.2 Education and Training BY Conservation Districts

Education and outreach to municipalities, other potential grant applicants, and other local entities is required of each district. Below are some ideas for districts to improve the local education and outreach effort. Please contact the CDGRS if you have questions or would like assistance setting up any of the potential outreach activities below.

3.6.2.1 Participating in Existing Outreach Events

Many counties have local or regional events that provide the opportunity to reach many potential grant applicants and other public entities. Consider becoming a member of local and/or statewide municipal associations, such as a local Council of Governments or PA State Association of Township Supervisors, to participate and promote the DGLVR Program through their events and media. Providing outreach and education at these events, such as developing a traveling display, can be an excellent use of educational funds. Some potential opportunities for such outreach include:

  • Municipal Conventions: The CDGRS and SCC participate in Township and Borough annual conventions each year. Many counties host their own municipal conventions every year that provide an excellent opportunity to meet with or even present to many local government entities.
  • Contractor Workshops: Many regions around the state hold “contractor workshops” or other such educational days. These events are typically one-day “mini-conferences” relating to a variety of programs. They can provide a great opportunity to interact with municipalities as well as some of the sub-contractors they frequently use.
  • Elected Official Breakfasts: Many counties have various events for their elected officials. Municipalities are often invited to these brief sessions that highlight some local projects going on in the county and can provide an excellent showcase for completed DGLVR projects.
  • Municipal Visits: Consider visiting municipalities during slower times of the year to discuss the program, potential projects, and to establish a better working relationship with them.

3.6.2.2 Host Outreach Events

In addition to participating in some of the existing events described above, many districts host their own events for education and outreach. Consider involving other entities in the presentation of these events such as product suppliers, contractors, equipment companies, and the townships involved in the projects.

  • DGLVR Demonstration Days: “Demo Day” is a term used to describe half-day educational sessions held on a project site, typically aimed at municipalities. It is recommended that demo days be kept to a maximum of 2-3 hours and include breakfast or snacks to encourage attendance. Demo days typically include some type of presentation or talk at a certain time (either in the field, or indoor with a presentation), followed by a walk-through of the field site being used for the demo. Attendees can then stay as long as they like to ask questions and interact with the district. Active project sites, especially when new or innovative practices are being implemented, often make the best demo days. Another option is to hold dual “before and after” demo days, where the first day is spent going over the plan before the project begins, followed a month or so later by a day spent walking through the completed site.
  • Program Update Sessions: Districts are encouraged to host presentation and discussion sessions to provide Program updates for municipalities and other applicants. These sessions can focus on policy updates or simply showcase completed projects from the previous year. Update sessions can be general, or focused on a particular subject, such as “Administering the DGLVR Program for municipal secretaries”. They can also be combined with other programs run by the district.
  • Project Tours: Many districts hold annual project tours where attendees board a bus and visit a wide variety of field sites. These tours can be customized for a range of audiences, and can be DGLVR focused, or include projects from other district programs as well.
  • Pre-Application Site Visits: A pre-application site walk-through is highly recommended and provides an excellent opportunity for one-on-one education and outreach with the applicant.

3.6.3 Program and Project Promotion

Districts are encouraged to use their education funds to promote the Program and completed projects however they can within their county. Some ideas for such promotion include:

  • Press Releases: After a particularly successful project, consider drafting a brief press release and making it available to local media outlets. Often such simple efforts can be picked up by a variety of media outlets and provide an effective and nearly free source of promotion.
  • Newsletters: Many districts have monthly newsletters where they include short write-ups of successful DGLVR projects. A few larger districts even have “DGLVR only” newsletters they periodically send out to their municipalities.
  • Project Signage: A simple but underutilized form of project promotion is to place signs on completed projects such as “Road improvements sponsored by…..”, or “Another successful project from……”. Signs do not have to be permanent. Many sign shops can produce simple signs on corrugated plastic that are relatively inexpensive and will last 1-3 years. Check with the municipality to make sure signs are in compliance with any sign ordinances.

3.7 Program Eligibility

3.7.1 Eligible Applicants

State and Municipal public entities that own public roads in Pennsylvania that are open to public vehicle travel are eligible to apply to districts for Program funding. Municipalities and other eligible and ineligible entities are described below.

The person in charge of work plan development and project implementation from the entity that has applied for funds from the Program must have attended environmentally sensitive maintenance (ESM) training within the past five (5) calendar years to become “ESM Certified” to apply for funding.

In determining applicant eligibility, it is important to focus on the entity that owns the road itself, not necessarily the land the road traverses. Often one entity owns the road through the property of another entity: for example, a township-owned road through state forest land. The entity that owns the road corridor is the entity that is eligible to apply for funding.

The “ESM certified” person for the applicant must be an employee or elected official of the entity. The ESM certified individual must be the person in charge of work plan development and project implementation for the applying entity. Attendance by individuals not directly involved with the project design and implementation (interns, secretaries, etc.) do not qualify an applicant to be eligible for funding. Engineers on retainers or others who serve multiple municipalities are welcome to attend the ESM training, but their attendance does not count as ESM Certification for the municipalities they represent. Alternatively, if an engineer is on the payroll at a particular eligible entity, it would count as ESM certification for that municipality. Empowering and educating local municipalities is one of the primary benefits of the Program. In the case of other entities, the person who has direct oversight responsibilities for the project must be the one to attend the ESM training. Individuals that have a current ESM training certification may attend an annual maintenance workshop once every five years in lieu of re-taking ESM training. Individuals whose five-year ESM certification has expired may not use the annual maintenance workshop as recertification but must re-attend an ESM training.

3.7.1.1 Municipalities

Eligible municipalities in Pennsylvania include 1,500+ townships, 900+ boroughs, and 50+ cities. Districts should become acquainted with the various municipal officials and employees in their counties. Boroughs and cities will likely play a larger role in the low volume road portion of the Program.

To date, townships are the most frequent Program applicants, accounting for over 90 percent of the projects completed statewide. Township size, composition, and structure vary widely across the state. The two township positions most likely to be involved in Program projects are the “Supervisor” and the “Roadmaster”. Supervisors are elected officials who handle a great variety of tasks for a township. Roadmasters can be elected supervisors or hired employees and are the people in charge of road maintenance for the township. Depending on size, population, and funding, a township may have multiple roadmasters and supervisors or may have one person serving in both capacities. Pennsylvania’s 1,500+ townships are governed by the Township Code. A complete copy of the 2nd Class Township Code may be found here.

Boroughs are small to large towns that have incorporated boundaries. Borough involvement in the Program has been limited in the past since they own fewer unpaved roads than townships, but their involvement has increased with the addition of paved low volume roads to the Program in 2014. Boroughs, like townships, vary widely in their size and structure. Borough staff under the Borough Code requires a borough secretary and allows for a borough manager including engineers as well. It is not mandated, but it is not unusual for there to be a public works department to provide road maintenance services. Pennsylvania’s 900+ boroughs are governed by the Borough Code. A complete copy of the Borough Code may be found here.

Cities, like boroughs, will likely play a larger role in the low volume road portion of the Program. Their size and structure vary considerably across the state.

3.7.1.2 Other Potential Applicants

Other local, county, or state public entities that own and maintain public roads that are open to public vehicle travel are eligible to apply to the district for project funding. The most common of these entities are listed below, although the list is not all-inclusive:

PA Department of Transportation (PennDOT): PennDOT owns ~500 miles of unpaved roads and thousands of miles of paved low volume roads. PennDOT projects are typically designed at the regional level by regional engineers. Project oversight, however, is typically done at the county level by county maintenance managers. Both the project designer and the person in charge of project oversight must be ESM certified. Signatory authority for applications resides in the PennDOT District Offices.

PA Game Commission (PGC): The PGC owns approximately 1,000 miles of public use roads and 400+ miles of seasonal roads Statewide. However, pursuant to Act 34 of 2023, December 13, 2023, no money appropriated from the Motor License Fund for maintenance and improvement of dirt, gravel, and low volume state and municipal roads under 75 PA. C.S. § 9106 (relating to dirt, gravel, and low-volume road maintenance) may be used on land owned or otherwise under the control of the Pennsylvania Game Commission. Any updates to this provision will be provided on the CDGRS’s website.

PA Fish and Boat Commission (PFBC): PFBC ownership of roads is minor except for access roads and boat launch ramps. Boat launch ramps that are open to public use are eligible for funding. The PFBC personnel responsible for the project area must attend ESM training. Signatory authority for projects resides in the PAFBC Regional or Central offices.

County and other Government Entities: In many cases other local government agencies or authorities, including but not limited to parks departments, municipal sewer and water authorities, etc. that own land and roads that are open to public travel. If the roads meet the requirements for worksite eligibility and the person in charge of maintaining those roads has ESM certification, they are eligible for funding.

Department of Conservation and Natural Resources (DCNR): DCNR (through State Parks and the Bureau of Forestry) administers more than 3,000 miles of dirt, gravel, and paved low volume roads. DCNR directly receives $7,000,000 per year under the Program, separate from the SCC allocation. DCNR officials are also required to be ESM certified to participate in the Program. The DCNR portion of the Program is administered separately from the SCC portion.

3.7.1.3 Determining Road Ownership

For Program eligibility, the entity that owns the road “right-of-way” is the determining factor, not who owns the land adjacent to the road. For example, a township may own a road that is surrounded by state or national forest on both sides.

Contracts and payments can only be made with the entity that owns the road. In some cases, the ownership of a road may be in question or unknown. Some considerations in determining road ownership of “orphaned” roads:

  • If a municipality receives “Liquid Fuels” funding for the road, then it is eligible.
  • Most public roads will have courthouse records of ownership.
  • It is the responsibility of the potential applicant to prove road ownership to the satisfaction of the district.
  • Solicitors may be able to help with road ownership determinations.

If road ownership cannot be readily determined, it is the responsibility of the applicant, not the conservation district, to provide written documentation of road ownership.

3.7.1.4 Ineligible Entities

Federal Government: The Federal Government owns and maintains roads in various capacities from national parks and monuments, U.S. Army Corps of Engineers lands, and the Allegheny National Forest. The Commonwealth of Pennsylvania cannot pay or provide funding to maintain roads owned by the federal government.

Private Road Owners (individuals and entities): Privately owned roads, even those open to public use, are not eligible to apply for funds. This applies to roads owned by private individuals, but also includes roads owned by associations, private conservancies, non-profit companies, and other non-public entities.

3.7.2 Eligible Roads

Only public roads impacting water quality and owned by one of the eligible applicants described above may be considered for funding. A road must also be open to public motor vehicle travel for a minimum of two consecutive weeks annually prior to submitting a DGLVR grant application to be eligible for funding. Definitions of each road type are below.

“Eligible Sites”

  • Stream Impact
  • Publicly owned
  • Open to public travel
  • ESM certified
  • <500 ADT (if paved)

3.7.2.1 Dirt and Gravel Roads

The “Dirt and Gravel” portion of the Program is designed to fund work on public roads with unbound road surfaces. These are surfaces of natural material or crushed aggregate that have not been incorporated into a bound layer using asphalt, oil, or other such binder. Generally, “unpaved” roads are roads that are graded and rolled as part of routine maintenance.

3.7.2.2 Paved Low Volume Roads

Low volume roads must have an existing paved (including chip sealed) surface and a verified average daily traffic count of less than 500 vehicles per day (according to SCC guidance). For more information on traffic count guidance, see section 7.4. Paved and sealed surfaces include asphalt, oil, chip seal, or other such binders.

3.7.2.3 Retiring Roads

An applicant may own a road that they want to close to vehicular traffic. There could be significant environmental benefits to retiring these roads using sound ESM practices that eliminate existing resource concerns. This is an eligible program expense. Roads cannot be closed with DGLVR funding without remediating environmental impacts with ESM practices prior to retirement. Given the complexity of this practice, districts should contact the CDGRS and/or SCC for assistance.

3.7.2.4 Road Relocations

There may be significant environmental benefits to relocating a road. Some examples are as follows:

  • Shift a road in one direction or another to get the road on more stable soil (slide repair).
  • Shift a road away from a stream bank to allow room for bank stabilization or other practices.
  • Relocate a road to a location that would eliminate a stream crossing.
  • Relocate a road to avoid an excessively steep slope.

When a new section of road is created for the relocation, the existing section of road must be taken out of use and reclaimed using ESM practices. If the existing section of road cannot be retired (i.e. – road must remain available for field access, hunting camp access, etc.), the new section of road may not be paid for with program funds, unless otherwise approved by the SCC.

3.7.2.5 Creating New Roads

New road construction is only allowed provided it is part of a road relocation, and the existing roadway is either retired and properly stabilized or is adequately addressed so as not to continue to be a source of sediment and/or dust pollution. Creating new roads (without road relocation), such as new roads for a new development, or new roads to access a park, etc. are not eligible for funding under this program.

3.7.3 Eligible Projects

Dirt, gravel, and low volume road projects must focus on both environmental and road improvements. Projects should focus on worksites (identified pollution sites) and Environmentally Sensitive Maintenance (ESM) practices to reduce pollution while providing a more stable road. Only projects that provide environmental benefit, typically by reducing sediment and concentrated drainage to streams, wetlands, or other aquatic resources, should be considered for funding. Worksites are described in detail in section 1.4. The focus of the DGLVR Program is on long-term environmental and road improvements. The Program does not fund “routine maintenance” that is part of the regular duties of the road owner such as simply grading roads, crack-sealing/resealing asphalt or chip seal, street sweeping, cleaning inlets, or bridge repair.

3.7.4 Eligible Project Expenses

There are no special Program-specific purchasing procedures or bid requirements for paying for material, equipment, or labor costs for Program projects. Municipalities should use their municipal code as guidance. Other grant recipients should follow normal purchasing procedures and normal contract procedures using advertising and bidding as warranted. Those expenditures must be tracked following normal bookkeeping and audit procedures, and records must be retained for a minimum of seven years from project completion. Applicants may apply for the full costs of all materials, equipment, and labor required for implementation of the project (there is no statewide in-kind requirement). It is up to individual districts to determine which project costs will be reimbursed by Program grant funds.

3.7.4.1 Materials

Typical material expenses on a project that can be reimbursed with Program funds include but are not limited to items such as pipe, stone, fill, fabric, aggregate, etc. Products with the potential ability to leach off the road (such as dust suppressants or road stabilizers) must meet SCC requirements for non-pollution. The CDGRS maintains a list of approved products that are eligible for use on Program projects. For more information on approved products see section 6.2.11.

Fill Materials – This guidance is applicable to materials used in the program as road fill. The following materials may be used in the program if it is deemed “free” of pollutants AND will have a driving surface applied:

  • Fill materials such as dredged material, used asphalt, brick, block or concrete from construction and demolition activities that show evidence of potential contamination with pollutants must be tested and certified as clean fill under 25 Pa. Code Chapters 271 to 285 (municipal waste regulations). If due diligence shows no evidence of potential contamination, then the fill material may be used as clean fill.
  • Industrial byproducts used as road fill such as slag, bottle glass, and foundry sand must be tested and determined to be free of pollutants under the applicable section(s) 25 Pa. Code Chapters 271 to 287.
  • Coal combustion products that possess current DEP certification may be used as road fill. (‘Red Dog’ is not permitted for use anywhere in the program)

Other Products/Materials – If a material or product is identified that falls into one of the above classes of products but is not specifically covered in this guidance, a petition that is accompanied by a detailed justification for its inclusion in the above list can be submitted to the CDGRS for review and consideration for approval by the State Conservation Commission.

Inlets and outlets of all cross pipes must have erosion protection and demonstrate stability. All stream crossing structures must have a headwall and endwall. Stacked bags of cement mix and gabion baskets are not eligible to be used on DGLVR Projects, unless otherwise approved by the SCC along with technical guidance from the CDGRS. These practices have historically failed due to uneven cement curing and weakness of the wire gabion baskets, leading to accelerated erosion and sedimentation.

3.7.4.2 Equipment

Program projects are often completed with applicant-owned equipment. Reimbursement of applicant-owned equipment costs is an eligible expense under the Program. Applicant-owned equipment can be reimbursed up to accepted Federal Emergency Management Agency (FEMA) rates. FEMA rates should also be used to calculate in-kind contributions for applicant-owned equipment. FEMA rates do not include operator costs. FEMA equipment rate website here. Contact SCC or CDGRS staff for questions about equipment without listed FEMA rates. Where FEMA rates do not accurately reflect local equipment costs, applicants may request approval to use other rates, if written documentation can be provided.

Some Program projects may require equipment that the applicant does not own. It is an eligible expense for an applicant to rent or lease equipment necessary to complete a project with Program funds. Equipment rented or leased with Program funds can only be used on the project for which it was rented.

DGLVR funds, including project, administrative, or education, cannot be used to purchase, cost share, or maintain equipment for an applicant. There are rare cases where it is cheaper to buy equipment for a grant recipient than to rent. In these cases, contact the SCC for approval. It is acceptable for a district to purchase equipment for loan/rent to applicants. A district may purchase such equipment with administrative and educational funding as outlined in section 3.4.3.

3.7.4.3 Labor

Program projects are often completed using applicant labor and equipment operators. Reimbursement of applicant labor and equipment operators is an eligible expense under the Program. Labor rates may include benefits. Because DGLVR grant recipients are always public entities, prevailing wage is not required to be paid for labor provided by the grant recipient.

3.7.4.4 Contractor Costs

Projects may be completed entirely or partially by contractors hired by the grant recipients. Grant recipients should follow their standard procedures regarding project bidding and working with sub-contractors. Districts must make payments directly to the grant recipient, not to the grant recipient’s contractors.

Projects funded by Program funds that are bid out to contractors, including owner-operators and/or sole proprietors, in which the estimated cost of the total project, exceeds prevailing wage limits (currently $25,000) are subject to provisions of Pennsylvania’s Prevailing Wage Act (1961, August 15, P. L. 987, No. 442), 43 P. S. Section 165-1 et seq.

3.7.4.5 Prevailing Wage Documentation

Where prevailing wage applies, it is the responsibility of the grant recipient to register the project with the PA Department of Labor and Industry, and include prevailing wage notification in any proposal to solicit bids for the contract.

Conservation Districts need to notify grant recipients of prevailing wage requirements.

Prevailing wage scale can be obtained from the Prevailing Wage Division of the Pennsylvania Department of Labor and Industry. Contact your solicitor or the Pennsylvania Department of Labor and Industry for additional guidance and questions. A “Frequently Asked Questions” document concerning prevailing wage can be found on the Center’s Reference Material. Additional information available from the PA Department of Labor and Industry can be found here.

It is the responsibility of the grant recipient to ensure prevailing wage has been paid and to obtain copies of certified payrolls from any contractors where prevailing wage applies. Conservation districts need to notify grant recipients of prevailing wage requirements.

A prevailing wage “Notification letter”, attachment E to the DGLVR Contract, must be completed and kept in the project file. This letter ensures that applicants have verified that they are aware of prevailing wage requirements.

If federal funds are involved in a project, federal prevailing wage requirements (Davis Bacon Act) often supersedes PA prevailing wage. Davis Bacon requirements are acceptable to the DGLVR program in this case.

3.7.4.6 In-Kind Contributions

In-kind contributions refer to costs incurred by the grant recipients for a project that are not reimbursed as part of the grant. In-kind or matching contributions from grant recipients are not required statewide. Districts, however, may establish matching requirements or give additional consideration to projects with in-kind funding.

While matching contributions are not required, the Program does track in-kind contributions from grant recipients as part of project reporting. In general, in-kind is limited to un-reimbursed materials, equipment, and labor from the grant recipients that is part of the Program project. Only costs that are directly part of a Program project, and that meet the intent of the Program, shall be considered as in-kind.

3.7.4.7 Consultants, Engineering, and Permitting Costs

Program funds can be used to reimburse engineering, permitting, or similar consultant costs. Grant recipients are encouraged to bid out engineering services. Projects which competitively bid out engineering services can pay for up to 100% of the engineering and design costs, at the discretion of the conservation district. Projects which do not competitively bid out engineering services are limited to a maximum of $35,000 for engineering and design services, at the discretion of the conservation district.

The Program’s Request for Proposals (RFP) is required if bidding engineering for stream crossing projects. Districts are encouraged to work with the SCC and the CDGRS to tailor the RFP to meet specific project needs.

Preparation or design costs such as engineering or surveying that are incurred before the contract is signed are not eligible for grant reimbursement but can be counted as in-kind. If the DGLVR project is not completed, consultant, engineering, and permitting costs are not an eligible DGLVR expense.

3.7.4.8 Working off the Right-of-Way

Public roads have a right-of-way that extends out from the centerline of the road. The size of the right-of-way varies based on road owner and road classification.

Often, significant drainage and sediment that negatively affects the public road comes from outside of the right-of-way. Sources include, but are not limited to, farm fields, access lanes, and driveways. Working outside the road right-of-way is an allowable Program expense, but only when the off-right-of-way impact is having a direct negative effect on a public road AND addressing the off-right-of-way impact is directly necessary to the successful completion of the project on the public road. Off right-of-way work can be completed either upslope or downslope from the road but must be limited in scope to cost-effective practices that directly reduce road impacts.

Before working outside the right-of-way, the grant recipient must obtain written permission from the landowner. Landowner permission should be sought as early as possible in the funding process, ideally before contracting, to ensure the project can be implemented as planned. A sample landowner agreement is provided on the Center’s Project Management/CD Financial Resources page. Districts and grant recipients can use their own landowner agreements if they are in a form and manner like the sample provided. Districts must keep a copy of the signed landowner consent form with the project file for any work performed off the right-of-way.

In certain situations, off right-of-way work requires prior written approval from the State Conservation Commission. Where off right-of-way work is more than 40 percent of the total project costs (including Program funds and in-kind contributions), or where work extends more than 500 feet off the right-of-way districts must first obtain written approval from the SCC before a contract can be signed. The district must keep a copy of the written SCC approval for off right-of-way work with the project file.

Funds can be spent on activities outside the right-of-way only when:

  • It is part of a larger project on a public road.
  • The issue on the public road cannot be effectively resolved within the right-of-way with traditional ESM practices.
  • The district determines it is directly necessary as part of the successful completion of the project on the public road.
  • It is limited in scope to cost-effective ESM practices that directly reduce impacts to the public road.
  • It is limited in size to only address the area necessary to reduce impacts to the public road.
  • Prior written approval of the SCC is obtained, if required (see above).
  • The grant recipient has obtained written permission from the landowner.

If project work is confined to the road right-of way, landowner permission is recommended when downslope property will be impacted by road practices. This is particularly true where new drainage outlets from pipes, turnouts, etc. may impact the downslope landowner.

In some cases, landowner permission may be instrumental to implementing a successful DGLVR project (additional culvert outlets for example). In some cases, a viable alternative may exist to implement a successful plan without landowner permission, but in other cases, sufficient water quality improvements cannot be made due to landowner constraints. In such cases, DGLVR funding may be better spent on a different project location. Contact the SCC in questionable circumstances where a lack of landowner permission may hinder successful project implementation.

3.7.4.9 Combined Funds

Program funds may be combined with other funds to pay for a road maintenance project. If Program funds are combined with other funding sources, detailed accounting of which funds were spent on which portions of the project must be maintained. Other funding sources may be used as matching funds for Program projects, provided the Program funds are used on identified pollution worksites. Any practices funded fully or in part with DGLVR funds must still adhere to all the DGLVR Program’s requirements, standards, and specifications.

It may be possible to complete a project in stages where the Program funds are used on a phase of a project (i.e.- drainage and base improvements) and another funding source is used on a different phase ( i.e.- improving the road surface).

3.8 Administering Projects

3.8.1 Notification to Applicants

The district is responsible for informing all potential applicants of funding availability, application deadlines, and other information necessary for Program participation. District staff should work with the Quality Assurance Board (QAB) in development of strategies for ensuring equal access and notification to potential Program applicants. More details are available in the QAB section 4.4.1.1.

Conservation districts are strongly encouraged to meet with potential applicants on site to discuss the potential project before an application is submitted for funding.

3.8.2 Pre-Application Site Visit

Districts are strongly encouraged to meet with potential applicants on site to discuss the potential project before an application is submitted for funding. Note that a pre-application meeting is required for stream crossing replacements (see section 7.1 for details). The purpose of a pre-application meeting is to work jointly with the applicant to ensure that the plan they submit is in the best interest of both entities. Some applicants, especially those new to the Program, may focus on road improvement concerns over environmental concerns. The pre-application meeting allows districts to provide input on the potential project at an early stage before the applicant has invested a large amount of time and resources in developing a plan. Program Quality Assurance / Quality Control visits have repeatedly shown that districts that conduct pre-application site visits have a better relationship with their municipalities and end up putting better projects on the ground.

This visit also allows an early discussion of potential topics relating to permitting, funding availability, and other issues that could affect the scope or design of the project. Potential landowner issues, discussed in section 3.7.4.8, should be a part of the initial site visit. Often the type of practices used on a road will depend a great deal on the cooperation of local landowners, especially where off right-of-way work or additional drainage outlets are required for successful project completion. The district may develop local polices requiring pre-application meetings.

3.8.3 Pre-Design Site Visit

Many Program projects, such as most stream crossing replacements, will require a design and/or seal from an engineer. If the services of an engineer are required, it is strongly suggested that the district holds a pre-design meeting on site with the applicant and their engineer either before or after an application is submitted. Note that a pre-design meeting is required for stream crossing replacements (see section 7.1 for details). This meeting ensures that the engineer designs a project or structure that best meets the needs of the county, applicant, and Program. Districts may develop local policies requiring pre-application or pre-design meetings. Costs incurred before a contract is signed are not eligible for reimbursement under the grant.

3.8.4 Receiving Grant Applications

3.8.4.1 Application Process

All applications for Program funding must be received on the “Dirt, Gravel, and Low Volume Road Maintenance Program Grant Application” one-page form that has been approved by the SCC. The form must be signed by the applicant. The form, and instructions for completing the form, can be found in Appendix C.

District staff should review applications for administrative completeness and ensure they comply with established Program policies, standards and specifications, and guidance. A project sketch, location map, and itemized costs are a required part of the grant application. District staff are encouraged to work with applicants to revise the scope of their applications that do not meet Program standards. Districts may make minor changes to the application and have the applicant show concurrence by initialing and dating the change. In cases where significant changes are needed to the application work plan, the district should work with the applicant to create a new application that represents an acceptable project. Examples of “significant changes” may include changes in project scope, recommended design changes, considerations for engineering and permitting costs, resizing of stream crossing structures, etc. The district may, at their discretion, refuse to accept incomplete applications or applications that do not properly address environmental issues.

Applications that district staff deem complete and potentially acceptable to the Program should be forwarded to the local Quality Assurance Board (QAB) for review and prioritization. The QAB will review and prioritize applications based on established written criteria and make funding recommendations to the conservation district board. Details of the QAB review process can be found in section 4.3. The QAB operates in an advisory capacity only. All applications for funding must be acted on by the district board at a sunshined meeting. All applicants should be notified in writing of the funding decisions of the district board.

3.8.4.2 Unfunded Applications

Districts may develop their own county policies on the retention of unfunded applications. Applications may be retained for consideration in the next grant round, or the district may request the re-submittal of applications for each grant round. If unfunded grant applications are retained, the district should check with the applicant before the next grant cycle to ensure the scope or costs of the application have not changed.

3.8.4.3 Grant Funding Cycles

Districts may have an open application period, or they may establish application deadlines. Many districts have established application deadlines to encourage timely submittal by applicants. Some districts have also moved to a fall submission deadline, giving them all winter to revise applications, rank projects, obtain permits, meet with sub-contractors, and perform other logistics so that the project can begin the following spring. All eligible applicants should be informed of any application deadlines in accordance with the notification requirements outlined in section 3.8.1.

3.8.5 Contracting

All contracts, amendments (if applicable), and completion reports must be generated using the GIS. When a contract is signed, the attachments listed in the contract and described below become a legally binding part of that contract. The contract and project-specific attachments must be retained with project files. The attachments to each Dirt, Gravel, and Low Volume Road Maintenance Program Contract include:

  • Grant Application and Workplan: (attachment A to contract) The approved grant application submitted by the applicant, including cost estimate breakdowns. The grant application must include a workplan, which consists of a hand-drawn or digitally produced sketch of the proposed project. A workplan is a plan view of the road with all planned features such as pipes, aggregate, underdrain, surface features, etc. Applicants may use the space provided at the back of the grant application for the work plan. The grant application must also include a map that identifies where the project is located. When the scope of project work is changed, it is recommended to document this on an updated grant application that is signed or initialed by the conservation district and grant recipient. At a minimum, districts must keep records of changes such as in a project narrative, via letters, in a saved or printed email, or other documented communication. The DGLVR “Contract Amendment Form” can also be used to formally record changes to the project scope.
  • General Contract Provisions: (attachment B to contract) Standard contracting provisions required on all Program contracts.
  • QAB/District Standards and Policies: (attachment C to contract) Any policies adopted by district board. Note that these policies are county specific.
  • Schedule of Payments: (attachment D to contract) One page form that outlines how funding will be distributed by the district to the grant recipient.
  • Prevailing Wage Notification Letter: (attachment E to contract) Letter signed by grant recipient indicating they are aware of prevailing wage requirements.

3.8.5.1 Contract Attachments

When a contract is signed, the attachments listed on the contract and described below become a legally binding part of that contract. The contract and project-specific attachments must be retained with project files. The attachments to each Dirt, Gravel, and Low Volume Road Maintenance Program Contract include:

  • Grant Application and Workplan: (attachment A to contract) The approved grant application submitted by the applicant, including cost estimate breakdowns. The grant application must include a workplan, which consists of a hand-drawn or digitally produced sketch of the proposed project. A workplan is a plan view of the road with all planned features such as pipes, aggregate, underdrain, surface features, etc. Applicants may use the space provided on the back of the grant application for the work plan. The grant application must also include a map that identifies where the project is located. When the scope of project work is changed, it is recommended to document this on an updated grant application that is signed or initialed by the conservation district and grant recipient. At a minimum, districts must keep records of changes such as in a project narrative, via letters, in a saved or printed email, or other documented communication.
  • General Contract Provisions: (attachment B to contract) Standard contracting provisions required on all Program contracts.
  • Program Statement of Policy: (attachment C to contract) incorporated into Contract by reference only and included in Appendix B of this manual.
  • QAB/District Standards and policies: (attachment D to contract) Any policies adopted by district board. Note that these policies are county-specific.
  • Schedule of Payments: (attachment E to contract) One page form that outlines how funding will be distributed by the district to the grant recipient.
  • Prevailing Wage Notification Letter: (attachment F to contract) Letter signed by grant recipient indicating they are aware of prevailing wage requirements.
  • Prevailing Wage Certified Statement of Compliance: (Attachment G to contract) Two page form from PA Department of Labor and Industry completed by contractors to verify prevailing wage was paid.

3.8.6 Pre-Construction Logistics

3.8.6.1 Permits, PA One-Call

It is the responsibility of the grant recipient to ensure that all necessary permits are obtained and any other pre-project requirements such as PA One-Call are met. For more details on permits and other requirements, refer to Chapter 8.

3.8.6.2 Pre-Construction Meeting

It is the responsibility of the grant recipient to ensure that all necessary permits are obtained and any other pre-project requirements such as PA One-Call are met. For more details on permits and other requirements, refer to section 7.1 for details). If the grant recipient is utilizing a subcontractor, the subcontractor should be involved in the pre-project meeting. During the meeting, each contract item or element of the approved plan should be discussed to avoid any misunderstanding about how the plan is to be implemented and how payment will be made to the grant recipient. In cases where Driving Surface Aggregate (DSA) is involved, the pre-construction meeting should be held as early as possible, prior to the start of the project, to allow for DSA sampling. Other more complex project elements such as stream crossing replacements or slide repairs may require additional lead time as well.

3.8.6.3 Notification of Project Work

Grant recipients MUST notify the district before beginning work on a project. The amount of notice needed must be spelled out in the contract with the district. This will allow the district to meet in person with the grant recipient and any contractors or sub-contractors who will be implementing the plan to determine the phase and sequence of the project and discuss other project elements. The district must also be notified before beginning a new phase of the project (for example, drainage work is completed, and aggregate placement will begin). The district may withhold payments and/or request reimbursement of advanced funds and cancellation of the contract if a grant recipient fails to comply with notification requirements.

3.8.7 Project Oversight

It is the responsibility of the district to ensure that the work being performed on the project is in accordance with the contract and attachments as well as Program policy and standards. Districts can request assistance from SCC or CDGRS staff on project oversight and implementation. Program Quality Assurance / Quality Control visits have repeatedly shown that districts who spend more time on-site during project implementation end up with more successful projects.

When it comes to project oversight, remember, “You get what you inspect, not what you expect.”

3.8.8 Contract Amendments

Contract amendments up to 40 percent of the initial contract amount are allowed at the discretion of the conservation district, and larger amendments require SCC approval. See section 3.5.3 for details on contract amendments.

3.8.9 Project Completion

Before final payment can be made to a grant recipient, the following are required: a final on-site inspection, a project completion report, and receipts for all grant expenses. An optional “File Checklist” that outlines documentation required and recommended to be kept in project hard files is available on the Center’s Project Management/CD Financial Resources page.

3.8.9.1 Final Inspection

Upon project completion, a final inspection must be scheduled on-site involving the district and the grant recipient. Final inspections should be scheduled immediately after work is complete, so any remediation can be done while equipment is still on site if needed. Other entities such as the QAB and sub-contractors to the grant recipient should be encouraged to participate. The purpose of the final inspection is to:

  • Verify the project is completed in accordance with Program standards as determined by the district.
  • Verify that all work elements classified as “in-kind services” are also completed in accordance with Program intent as determined by the district.
  • Verify that work elements proposed in the work plan have been properly installed. If not, remediation is required prior to final payment.
  • Allow the district to summarize the project work elements and costs on the project completion report.
  • Document any changes made from the grant application that have not already been documented.

3.8.9.2 Project Completion Report

A project completion report is required to formally report the status of projects as complete and close contracts. The completion report must be signed by both the district and the grant recipient.

3.8.9.3 Receipts for Grant Expenses

Receipts are required for all eligible expenses, including materials, equipment, labor, and engineering, covered by the DGLVR contract before final payments can be made and must be kept with project files. Receipts are encouraged but not required for grant recipient in-kind expenses.

3.8.10 Project File Retention

All records relating to the Program must be kept for a minimum of seven years from the date of final payment on a project. Files may be maintained in a hard file or electronic format. An optional “File Checklist” that outlines documentation required and recommended to be kept in project files is available on the Center’s Project Management/CD Financial Resources page.

3.8.11 Cancelling a Contract

In some cases, a grant recipient or conservation district may choose to cancel a DGLVR contract. If part of the project is completed to DGLVR requirements, the contract can be closed using the normal project completion procedure. If no project construction is funded by the DGLVR Program, the contract must be cancelled. For guidance on when to cancel a contract, contact the SCC. The procedure for cancelling a contract is:

  • The party initiating contract cancellation (grant recipient or conservation district) must notify the other party in writing of the contract cancellation, with effective date.
    • The conservation district board of directors shall act at a meeting to initiate or accept this cancellation. Conservation districts should follow their local policy/procedure on QAB involvement after contract funding.
    • Any advanced funds must be returned to the conservation district. It is best practice to document this in writing as well. It is at the discretion of the district whether to also request interest earned on Program funds to be returned.
    • Note that engineering expenses associated with a project that is not completed to DGLVR requirements are not eligible expenses.
  • The conservation district should work with SCC and/or GIS CDGRS staff to report returned advances and delete contracts as needed.
  • Conservation districts should keep the following documentation in the project file:
    • Documentation of the contract termination being initiated/accepted by both parties (conservation district and grant recipient).
    • Documentation that the advance payment was returned, if applicable (copy of the check and any cover letter from the grant recipient).

3.9 GIS reporting System

The Program uses a customized online Geographic Information System (GIS) called “DGLVR Mapper” to track potential and completed project locations, work completed, and expenditures. To obtain a user ID and password to login, district staff must attend a GIS training. Please contact the CDGRS to schedule GIS training for new staff and as needed.

Districts are encouraged to keep up with GIS data entry for funded projects on a real-time basis. At a minimum, districts must enter information on funded projects and program expenditures into the GIS system on a quarterly basis. All contracts, amendments (if applicable), and completion reports must be generated using the GIS. All funded projects are required to be filled out in the GIS as much as possible. This includes the grant application, contract, scope of work, amendments (if applicable), payment(s), completion report, and photos. Supporting files recommended to be uploaded include the grant application and project plan/sketch, receipts/invoices for project costs, traffic counts, stream crossing forms, off Right-of-Way agreements, etc. Uploading this documentation to the GIS can satisfy district requirements to retain DGLVR files for a minimum of 7 years. Districts are required to update the GIS database for the Quarterly and Annual Reports (as described below), and immediately before Quality Assurance / Quality Control visits.

3.10 Quarterly Reports

Districts are required to submit quarterly reports to the SCC using the DGLVR Mapper. Reports are due 15 days after each quarter ends, beginning April 15 for the January to March quarter. All administrative, education, and project expenses must be reported in the quarter in which they are paid out of the Program account. Districts must keep documentation of all Program expenses and income according to section 3.4. Financial staff involved in the DGLVR Program must complete a quarterly report GIS training to gain access to the quarterly report system. In addition, advanced training is available for district staff responsible for keeping the program’s financial records.

In order to submit quarterly reports, the following must be completed:

  • All income (advances, replenishments, interest) and expenses (project, administrative, and educational) for the quarter must be entered into the GIS system.
  • Local and GIS account balances must match before the quarterly report is submitted each quarter.
  • Information on funded projects is also required, including checking that all currently open contracts are in good standing and are not expired. The GIS includes a contract verifier tool that can be used during this process.
  • Complete the summary of Program activities from district staff for the quarter.
  • The Conservation District Manager, or its approved designee, is required to submit the report.

3.11 Annual Summary Reports

Districts are required to submit a report annually to the SCC on all project work and spending activity. The information on the annual summary report is used by the SCC to report to the Transportation Committees in the Pennsylvania House and Senate annually.

Since quarterly reporting is required for all Program expenditures, submitting the annual report is nearly automatic. Once the quarterly report due January 15th has been submitted and accepted, the Annual Report can be submitted in the DGLVR Mapper system. Completing the Annual Summary Report includes ensuring all quarterly reports are submitted and accepted, entering average limestone DSA cost, and managing project errors. The average cost of limestone aggregate (DSA) delivered (not placed) is a small factor in conservation district allocations (in accordance with section 9106, the law that created the Dirt and Gravel Road Program).

The State Conservation Commission shall annually assess the program and annually report to the Transportation Committee of the Senate and the Transportation Committee of the House of Representatives on its acceptance and effectiveness.
                -§9106, (D), (3)